Design, construction and fit out of a new energy centre for APS Salads flagship site; Europa Nursery.

Working with APS Salads (one of the UK’s largest tomato growers) and P3P, CambridgeHOK completed a full turnkey project including the design, construction and fit out of a new energy centre for APS Salads flagship site; Europa Nursery.

This project included:

  • Planning application and discharge foundations and site works
  • Glasshouse construction
  • Mechanical and electrical fit out
  • CO2 distribution
  • Civil and builders works
  • Heating
  • Irrigation
  • Electrics and controls
  • Environmental computer and CHP interface

CambridgeHOK and P3P designed and built a 15 MW gas-fired Combined Heat and Power (CHP) energy centre alongside nearly 15 hectares of existing and new, state of the art glasshouses. The process of using both the heat and power from one generator results in a more efficient and cleaner energy. Also by using the carbon dioxide within the food production, this bespoke energy generation concept significantly increases the crop yield and simultaneously lowers the CO2 emissions.

Two 7.5MW Rolls Royce engines were also used for this design. The gas-fired engines are housed next to the glasshouses in a specialist acoustic building, together with a CO2 treatment system and a large 5.6 million litres heat store and closed loop heating system. To supply the Rolls Royce engines and boilers the gas connection and electrical infrastructure and grid connection were upgraded. A new gas pipe was laid on site to accommodate the higher pressure required by the Rolls Royce engines. New regulator systems were employed to control the delivery of gas to the engines. The whole system is ultra-efficient at levels of over 90% with all the waste heat and most of the CO2 being used by the grower to enhance crop yields.

News

Latest News and Information

New energy centre and cooled packing...

A modern new energy centre and cooled packing facility which have been designed, built and installed b...

Read More

Robots Land at Cornerways Nursery ...

CambridgeHOK have now completed the project at Cornerways Nursery. We were employed to modify their tr...

Read More

P3P...

Design, construction and fit out of a new energy centre for APS Salads flagship site; Europa Nursery....

Read More

Percy Thrower ...

CambridgeHOK were responsible for the design and build of a brand new garden centre in Shrewsbury bein...

Read More

Call us to speak to a member of our team or complete the enquiry form and we will get back to you

We’re fully committed to handling personal information you’ve supplied to us in compliance with the latest GDPR laws, and we’ll never share your details.